Contact us for a FREE quote!
Contact us for a FREE quote!
Footings dug and reinforcement installed ready for readymix.
Concrete laid and bricks laid to damp course.
Membrane to floor and timber frame started.
Four sides of timber frame built.
A bit of maths to calculate trusses!
Angles cut to marry roof trusses.
Framework Completed
Plywood walls being added
Roof decked and breathable waterproof membrane
All sides complete
Waterproof, brathable membrane all round.
Battens added for Shingle Tiles and Cladding
Hardieplank Cementboard Cladding added to walls.
Eaves and recesses cementboard detailing.
Guttering added
Cedar Shingles being laid to roof. Natural oils in the wood protect from the weather and smell sooo good!
Angled shingle finishing to roof hip.
Beautiful natural shingles random shapes and colours to blend with the rural environment.
Full Kingspan Insulation for excellent thermal insulation and a cosy feel.
Fully boarded internally, plastering completed to ceiling.
Settling in, in the new workshop.
This is my recent project to create a new building from the ground up. This is a Garden Studio / Office.
It is a timber framed building on brick to damp course. It will be clad in plywood, membrane then cementboard for longevity and low maintenance. Green walls to blend in and a cedar shingle roof to continue the rustic theme.
Internally it will be completed with all round celotex insulation for warmth and comfort, floating boarded floor, and fully plastered walls to create a proper room in the garden.
Handyman Dan
Copyright © 2024 Handyman Dan - All Rights Reserved.
Powered by GoDaddy Website Builder