Digging trial hole to check foundations
Old Ceiling taken down to allow insulation to be added.
Bare Ceiling ready to rennovate
Painted Black Jack (bitumen) to walls for damp proofing
Both Single skin walls Black Jacked.
Battening out with studwork to accomodate insulation, services and foudation for the plasterboard
All insulated with thick Ecotherm board.
Bricks up to the damp course. Timber frame will go above.
Bricks to damp course.
Floor Black Jacked. Keep OUT until it dries!
Boxing in to cover services and provide a base for the plasterboard.
Careful cutting round for services.
High level window Knocked out with lintel installed. Insulation done and boarding commenced.
Boxing in for beam, and cupboards to be created.
Plasterboarding started to transform the space into a room.
Boxing in for beam & cupboards
Plasterboarding throughout room.
Multi finish plaster, ready to get going!
Plastering to back ceiling
Plastering started to ceilings
Plastering to left wall
Last area to plaster
Plastering Complete
Plastering can be a messy business!
Cleaning up
New door way put in
Door cut and planed to size, latch being cut in
Ready for cupboards to be built
Bespoke concealed cupboard hiding meters & services.
Concealed Cupboard housing boiler
Kitchen units installed into utility area with cupboards and intergrated appliances
Concealed cupboard housing meters
New door, frame & architrave
Window and rendering to front wall
A Garage conversion to provide more living and playing space for a family. This will be fully damp proofed and insulated to make a proper room. Wall and window to the front, and a new slot window cut in to the side to give dual aspect and plenty of light. The walls to be boarded and plastered, new electrics and lighting, a utility area and cabinetry to conceal the meters and boiler.